DTE Retro-Commissioning Program

September 15, 2016
5:30 PM to 7:30 PM
 Add to Calendar

DTE Energy
1 Energy Plaza
Detroit, MI 48226
 Directions

Please Join IFMA SE Michigan and EDSS 
A Presentation on Building Retrocommissioning. 
DTE Energy
1 Energy Plaza, Detroit, MI 48226
Executive Suite 255 WCB
Please check in at the Security Desk
Registration and Networking will begin at 5:30 p.m.
Food will be served 5:30 p.m. and during event.
Our Programming begins at:
6:00 p.m.
Q & A Opportunities
RetroCommissioning (RCx) is a facility assessment to evaluate energy-saving opportunities for an existing building to ensure all mechanical systems are operating as intended and at maximum efficiency.
The RCx process is based on the building type and current usage, especially if the current usage differs from the original design.
Typically it does not include upgrading or replacing equipment, but rather focuses on “tuning up” your existing equipment for better performance.
The process can provide commercial facilities with lower utility usage, operating costs, reduced maintenance, and improved comfort and productivity without making large capital investments.
As a Service Provider for the DTE Energy Retrocommissioning Program, Energy Design Service Systems (EDSS) will discuss how the utility RCx Program works and how you can take advantage of the utility-funded facility energy assessments to reduce your energy consumption.
Case studies will be presented as examples and for discussion.

Tickets

$0.00 Member

$35.00 Guests

Documents

Retro-Commissioning (RCx) Energy Efficiency Program